Step 27 of 36 · Manufacturing and field
The bill of materials and obsolescence
The bill of materials is the product. Control every line, know your single sources and plan for parts that disappear.
The bill of materials lists every part in the product, down to screws, labels and packaging. It drives cost, lead time, compliance and what the factory buys. An error in it becomes thousands of wrong units.
Treat it as controlled data with one master, revisions and approval for every change. For each important part know the manufacturer, the lead time, the lifecycle status and whether a second source exists. Single-sourced parts with long lead times deserve your personal attention.
Parts go out of production, often well within your product's life. Suppliers send change and end-of-life notices, and someone must read them. Each notice forces a choice: a last-time buy, a qualified alternative or a redesign. Plan engineering capacity for this every year.
Try this week
- Review your parts list for single-sourced and long-lead components and mark which have a qualified alternative.
- Find out who receives supplier change and end-of-life notices, and what happened to the last three.
Signs you've got it
- There is one master parts list, and the factory builds from its current approved revision.
- An end-of-life notice triggers a decision with an owner within weeks.
Resources
- articleThe Factory Floor, Part 1 of 4: The Quotation (or, How to Make a BOM) (opens in a new tab)Andrew "bunnie" Huang
- guideIEC 62402:2019 Obsolescence management (opens in a new tab)International Electrotechnical Commission
- bookDesigning Electronics that Work (opens in a new tab)Hunter Scott