Step 28 of 36 · Manufacturing and field
Production test
Every unit is tested on the line. You own the test design, its coverage, its limits and the data it produces.
Development tests ask whether the design is right. Production test asks whether this unit was built right, and it has seconds per unit to decide. It needs its own fixtures, firmware modes and software. Schedule it as a product in itself.
Your team should own the test design. A factory left to write the test will check what is easy to check. Cover every function the customer will use. Set limits from measured data across many units: too tight scraps good product, too loose ships bad product. Check that the fixture measures repeatably.
Store every result against the serial number. Yield and failure trends by station are your early warning, and the same data is what you will want when a field return arrives.
Try this week
- List the functions a customer uses and mark which the production test checks. Close the largest gap.
- Ask for first-pass yield and the top three failure causes from the last build.
Signs you've got it
- Production test fixtures and software are ready and tried before the production validation build.
- You can pull the factory test record of any unit by serial number.
Resources
- articleExclave: Hardware Testing in Mass Production, Made Easier (opens in a new tab)Andrew "bunnie" Huang
- guideGauge R & R studies (NIST/SEMATECH e-Handbook, 2.4) (opens in a new tab)NIST
- guideProcess or Product Monitoring and Control (NIST/SEMATECH e-Handbook, chapter 6) (opens in a new tab)NIST
- articleThe Factory Floor, Part 2 of 4: On Design for Manufacturing (opens in a new tab)Andrew "bunnie" Huang