Step 3 of 36 · Foundations
Phases from prototype to mass production
Know what each phase is meant to prove, from first prototype to production ramp, and what must be true to leave it.
Hardware programmes move through named phases. Names vary by company, but a common set is: proof of concept, engineering validation (does the design work), design validation (does it meet every requirement when built with production parts and tools), production validation (can the line build it at rate and yield), then ramp.
Each phase answers one question and ends at a gate. As a manager you need to know the question, the exit criteria and who signs. You do not have to run the gate, but you must refuse to pass it on hope.
The common failure is carrying open issues forward under schedule pressure. Problems that leave a phase unresolved come back later, at a higher price and in front of more people.
Try this week
- Write the exit criteria for your current phase on one page and ask your leads which ones are not yet met.
- Read the last gate review and list every issue that was waived. Check where each one stands today.
Signs you've got it
- Anyone on the team can say which phase you are in and what it has to prove.
- A gate has been held or repeated because exit criteria were not met.
Resources
- bookProduct Realization: Going from One to a Million (opens in a new tab)Anna C. Thornton
- bookPrototype to Product: A Practical Guide for Getting to Market (opens in a new tab)Alan Cohen
- articleEngineering Validation and Test (Field Manual glossary) (opens in a new tab)Embedded Artistry
- guideNASA Systems Engineering Handbook: 3.0 NASA Program/Project Life Cycle (opens in a new tab)NASA
- bookProduct Design and Development (opens in a new tab)Karl Ulrich, Steven Eppinger and Maria Yang