Step 15 of 36 · Quality and test
Design for test and for manufacture
A design that works on the bench is half done. It must also be buildable at volume and testable in seconds.
A prototype proves the design can work once. Production needs it to work every time, built by people and machines that have never met your engineers, from parts at the edges of their tolerances.
Design for manufacture means choosing parts, tolerances and assembly steps the factory can repeat. Design for test means the product can show quickly that it was built correctly: test points, a debug port, firmware self-test modes, access for fixtures. Both have to be designed in. Neither can be added after the layout or the tool is done.
Your role is to put manufacturing and test people in the room early and give their findings equal weight. The usual failure is treating their comments as optional polish.
Try this week
- Send your current design to your manufacturer or a manufacturing engineer and ask for a written review.
- Ask your test lead which functions cannot be tested on the line today, and what the design would need.
Signs you've got it
- Manufacturing and test engineers attend design reviews from the first prototype.
- Design changes requested by the factory are tracked and mostly accepted before tooling.
Resources
- articleThe Factory Floor, Part 2 of 4: On Design for Manufacturing (opens in a new tab)Andrew "bunnie" Huang
- guideManufacturability and Producibility (SEBoK) (opens in a new tab)Systems Engineering Body of Knowledge
- guideIEEE 1149.1-2013: Standard for Test Access Port and Boundary-Scan Architecture (opens in a new tab)IEEE Standards Association
- bookDesigning Electronics that Work (opens in a new tab)Hunter Scott